Part 2 · Chapter 2
Remedial Amendment Periods, the Required Amendments List, and Amendment Deadlines
Scope and status
This chapter covers the document-timing system that replaced periodic IRS review: the §401(b) remedial amendment period and the regulatory concept of a disqualifying provision (and its §403(b) analogue, the form defect), the remedial amendment periods that apply to new plans and to amendments, the annual Required Amendments List and its two-calendar-year deadline, the discretionary amendment deadline, the Operational Compliance List and its stale condition, the statutory amendment deadlines that override the general rules, and what happens when a deadline is missed. The RA List is reissued every year and each issuance resets the operative deadline — always work from the current list. Related questions are treated elsewhere: the determination-letter program in The Determination Letter Program; pre-approved cycles, opinion letters, and the provider/employer allocation in Pre-Approved Plans, Opinion Letters, and the Six-Year Cycles; §411(d)(6) anti-cutback and §204(h) analysis of any amendment in this Part's Plan Amendments, Mergers, and Terminations, which also carries the SECURE/SECURE 2.0 deadline unit in full; and correction of a missed deadline in Part 21 (Plan Corrections: EPCRS, VFCP, and DFVCP).
Sections
Part A — The Statutory and Regulatory Foundation
A1.Code §401(b) — retroactive amendment
Part 2, ch. 2, § A1
Code §401(b) permits a plan to be amended retroactively to cure a disqualifying provision, so that the plan is treated as having satisfied §401(a) for the period at issue, if the amendment is made within the remedial amendment period (RAP) — statutorily, the time prescribed by law for filing the employer's return (including extensions) for the taxable year in which the plan or amendment was adopted, as extended by the Commissioner. Statute: Code §401(b); Final reg: Treas. Reg. §1.401(b)-1.
A2."Disqualifying provision" and "form defect"
Part 2, ch. 2, § A2
For qualified plans, a disqualifying provision is (i) a provision that causes the plan to fail §401(a) as of the date the plan is put into effect; (ii) a plan amendment that causes the plan to fail; (iii) a provision designated by the Commissioner as a disqualifying provision resulting from a change in the qualification requirements; or (iv) the absence of a provision required by, or integral to, such a change. Final reg: Treas. Reg. §1.401(b)-1(b); Rev. Proc.: Rev. Proc. 2023-37 (restating the definition). The §403(b) analogue is a form defect, defined in parallel terms against the §403(b) requirements. Rev. Proc.: Rev. Proc. 2023-37; Rev. Proc. 2019-39.
A3.What the RAP does and does not forgive
Part 2, ch. 2, § A3
The RAP cures a document defect retroactively. It does not excuse operating the plan inconsistently with the qualification requirements in the interim; the plan must be operated in compliance from each provision's actual effective date, and the retroactive amendment must reflect how the plan was actually run. Statute: Code §401(b); Final reg: Treas. Reg. §1.401(b)-1; IRS Notice: Notice 2024-2 (stating the operational-compliance condition for the extended statutory deadlines).
Part B — The Remedial Amendment Periods for Individually Designed Plans
- B1New plansSubscribers
- B2Amendments to an existing planSubscribers
- B3Changes in the qualification requirements — the RA List ruleSubscribers
- B4Discretionary amendmentsSubscribers
Part C — The Required Amendments List
- C1What the RA List isSubscribers
- C2The two-part structureSubscribers
- C3What does not appear on the listSubscribers
- C4The current list — the 2025 RA ListSubscribers
Part D — The Operational Compliance List and Its Condition
- D1What it was meant to beSubscribers
- D2What it actually is todaySubscribers
Part E — Deadlines That Override the General Rules
- E1The SECURE / SECURE 2.0 amendment deadlines — two tracksSubscribers
- E2Retroactive adoption of a new planSubscribers
- E3The §403(b) transition historySubscribers
Part F — Missing a Deadline
- F1The failure and where it surfacesSubscribers
- F2CorrectionSubscribers
- F3The pre-approved plan consequenceSubscribers